Drilldown: CapGrads
Use the filters below to narrow your results.
Don't get to attached to your first idea, because it's going to change and one thing I had to let go, well try to let go, was my need to have everything be perfect, because it won't be perfect but you have to still do it and can't give up. (1) ·
HAVE A BACKUP PLAN!! And a backup plan for that. But remember there is a such thing as too safe. Let loose but be prepared for failures and lessons. (1) ·
Turn in your artifacts! They seem stupid but you will forget all of the cool stuff you have done for your project. (1)
I have been a Starbucks Partner for over two years, of that I was a barista for 11 months, a trainer for 9 and a Supervisor for the last 6. It took two separate interviews with two different store managers to finally get the job, but as soon as I did I fell in love with the job, my store, and cowork (1) ·
My capstone is my depop shop. I started making jewelry sophomore year, and selling it. This year I expanded it by learning other skills, such as sewing stuffed animals and embroidery. So my presentation is me explaining how I started it, my inspiration, how I package orders, and stuff like that. (1) ·
My original capstone project was to create an irrigation system for the plants in the Commons on top of the bookshelf. I designed the dropper, the base, end caps, the hose splitter, and connectors. I have my irrigation system put together on a metal shelf that I bought to finish the project. My irri (1)
I originally was writing a blog on the different hobbies and skills I was teaching myself and documenting the progress and how it shaped me as a person. (1) ·
My capstone project was an indoor irrigation system for the plants on top of the book shelves in the Commons. The irrigation system was to be automated and would only need for the reservoir to be filled every so often; everything else would be taken care of by the system. The system would run off of (1) ·
My initial idea was to document the process of becoming a shift supervisor at Starbucks, but because my store was in need of a supervisor and everyone I worked with was waiting on me to turn 18 so I could promote anyway, I ended up skipping a lot of the process. Since COVID -19 I am beyond proud to (1)
I have been super excited about presenting everything I have learned working at Starbucks and promoting within the company since we heard about the capstone project at the end of our sophomore year! As soon as we heard about it I knew I was going to present my promotions at Starbucks and everything (1) ·
It felt like I had to completely change my project. I had to downsize everything and almost start over. I lost the capability to set up the system how I had originally designed it. In order for the new system to work I had to completely change the way that the water was going to flow to the plants. (1) ·
So it was going as planned, and I even had a backup which is my book I'm writing but I didn't finish my book in time and I wasn't really impressed my how I wrote in my blog, so I changed it to my depop shop, that way all my work is the same but just presented in a different fashion. (1)
As I put this project together (gather photos and look through artifacts) I am realizing more and more that my coworkers are the best part of my job. From starting as a barista and working alongside most of them to learning from my supervisors (and friends) to becoming one of them. All of my barista (1) ·
I did the best that I could with the time that I had. I made a system that worked and that watered my plants. It is not nearly as fancy or sophisticated as I had originally planned on it being, but I still made it happen and I am proud of it. It was a struggle and a half to completely spin and start (1) ·
Well I learned how to embroider, and a bunch of other little skills like that. I also have been able to explore subcultures that I enjoy through fashion, and making mainly jewelry based off of them. It, over all, was a really fun project and I got to know myself better through it. (1)
Showing below up to 3 results in range #1 to #3.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


